翻訳と辞書
Words near each other
・ Wnory-Pażochy
・ Wnory-Wandy
・ Wnory-Wiechy
・ Wnory-Wypychy
・ Wnorów
・ Wnorów, Lower Silesian Voivodeship
・ Wnorów, Świętokrzyskie Voivodeship
・ WNOS
・ WNOU
・ WNOV
・ WNOW
・ WNOW (AM)
・ WNOW-FM
・ WNOX
・ WNP
WNP-1 and WNP-4
・ WNP-3 and WNP-5
・ WNPC
・ WNPL
・ WNPQ
・ WNPT
・ WNPT (TV)
・ WNPT-FM
・ WNPV
・ WNPX-TV
・ WNPZ
・ WNQM
・ WNRA
・ WNRB-LP
・ WNRC-LP


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

WNP-1 and WNP-4 : ウィキペディア英語版
WNP-1 and WNP-4

Washington Nuclear Project Nos. 1 and 4, abbreviated as WNP-1 and WNP-4 were two of the five nuclear power plants on which construction was started by the Washington Public Power Supply System (WPPSS) in order to meet projected electricity demand in the Pacific Northwest. WNP-1, WNP-2 and WNP-3 were part of the original 1968 plan, with WNP-4 (a twin to WNP-1 and located at the same site) and WNP-5 (a twin to WNP-3, in similar fashion) added in the early 1970s.
WNP-1 and -4 are located on , within the boundaries of the Hanford Reservation in the U.S. state of Washington, approximately east of the Columbia Generating Station. The WNP-1 site has been proposed as a potential pilot location for small modular reactors.
==History==
The Site Certification Agreement was approved in 1975, with construction commencing on both units later that year. Labor disputes at Hanford halted construction on WNP-1, -2 and -4 in 1980 and the forecast electric demand had failed to materialize, prompting WPPSS to install new management and re-evaluate the cost and schedule for all five nuclear projects.〔 In 1982, the Bonneville Power Administration, which had encouraged and was responsible for funding the construction of the initial three projects, had to decide between shutting down construction on WNP-1 or WNP-3. Construction continued on WNP-3 since WNP-3 was partly owned by public utilities and was slightly ahead of schedule, and WNP-1 entered an extended construction delay in April 1982 when it was approximately 63% complete.
Equipment and structures at WNP-1 were preserved to enable the resumption of construction at a later date, based on regional energy forecasts showing surplus power generation would disappear by 1990, but preservation was terminated in 1995.〔 However, the low humidity has maintained the structures in a reasonable condition.〔 The co-owners of WNP-4 and WNP-5 planned to fund similar preservation measures for a potential construction restart, but could not agree on funding obligations, and WNP-4 was canceled in January 1982 at approximately 24% complete.〔
With the shutdown of the nearby N-Reactor in 1987, a Department of Energy proposal to complete and convert WNP-1 to a tritium-producing reactor for the production of nuclear weapons materials was advanced. Senator Brock Adams and Representative Sid Morrison commissioned reports detailing the issues involved. Public reaction to the conversion proposal was mostly negative. WPPSS advanced a separate proposal to convert both WNP-1 and WNP-2 to dispose of highly enriched uranium and plutonium by using it as mixed-oxide fuel.
WPPSS's successor, Energy Northwest, submitted a revised site restoration plan in 1999 proposing several different alternative levels of restoration, ranging from putting a fence around the incomplete units to full demolition of all structures. Under EFSEC Resolution No. 302, a revised 'Level 3D' restoration is acceptable, which retains major structures such as the containment, turbine pedestal and auxiliary building. The final agreed-upon restoration adopts a two-phase site restoration, which retains major structures and utility infrastructure for potential reuse in the near-term.〔 The containment building at WNP-1 is slated to be retained, but the containment at WNP-4 will be demolished to approximately 25 feet above grade and sealed with a concrete cap in the long term.〔
In 2001, regional electricity shortages led to Energy Northwest's withdrawal of a request to terminate the construction permit for WNP-1. Instead, Energy Northwest commissioned a series of studies regarding the feasibility of restarting construction on WNP-1 and in 2002, the NRC extended construction permit CPPR-134 for WNP-1 to 2011, pending study results. These studies included one by Bechtel for a cost- and time-to-complete analysis, another study by R. W. Beck to independently assess Bechtel's methodology, a study by the Energy Northwest senior management team, and an industrial/political feasibility study by the lobbying group Goldschmidt-Imeson, which was founded by former Oregon governor Neil Goldschmidt. The studies concluded that restarting construction on WNP-1 was technically feasible but not cost-effective, with cost of completion estimated at . As a result, Energy Northwest requested termination of the construction license, which was received on February 8, 2007.
However, TVA has revived its terminated construction license for two similar partially completed units at the Bellefonte Nuclear Generating Station and has decided to proceed with staffing and long lead item ordering for completion of Unit 1. This indicates that it may be feasible to revive the construction license and complete WNP-1 if needed.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「WNP-1 and WNP-4」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.